STEAM CURTAIN

135. This Contractor shall furnish and install as shown on the drawings, the pipe and nozzles for the Steam Curtain effect including the flexible hose to the steam control valve.  The steam control valve and all piping to bring the steam to it shall be by OTHERS.


136. This Contractor shall furnish and install in pocket in stage floor, prepared by OTHERS, copper drip pan, under the effect pipe, and copper leader pipes to drain outlet in plumbing system provided by OTHERS.

137. The wood strip covering the steam curtain effect and all other wood work shall be by OTHERS.